On Monday, June 13, the foreign trade colleague of the packaging factory received a very urgent inquiry. The other party was a brand manufacturer of underwear. He said that this batch of packaging products would be used in half a month, including 3000 soft boxes, 9000 paper bags and a batch of corrugated boxes. That day, due to the time difference, the business colleague of the underwear packaging bag factory spent the whole evening talking with him about the time, Because on the whole, there are differences in many details.
When the delivery time was only one month, the colleague from the underwear packaging bag factory said that the quantity was too large to complete, so he had to do it in batches. Three different sizes of soft boxes also had to correspond to different sizes of paper bags, so three sets of cartons and model tools for making handbags were required, which was very cumbersome. In addition, half a month’s scheduling had to take a lot of time in advance, and samples had to be sent to confirm that the samples could be made into large quantities, These are very time-consuming.
There is also the possibility that hand-held bags may be made faster than cartons in the underwear packaging bag factory, but the problem to be considered is that the size of hand-held bags and packaging boxes may have to be enlarged due to some process problems, so the paper bags must also be enlarged, otherwise these paper bags can only be wasted, which is a regrettable waste.
After learning about so many disadvantages, the hurried guest told the foreign trade colleague of the underwear packaging bag factory, “then let’s go to find a factory that doesn’t need to be scheduled. It really wastes a lot of time.” After that, he went offline. His foreign trade colleague calmly left him a message: “there is no need to schedule, unless it is so large that he has time to stay. Otherwise, the business of the normal bra packaging bags factory is so cold that you have to pay attention.”
Sure enough, just last night, the business colleague of the underwear packaging bag factory sent good news that the missing guest had returned. He said that he had found several reliable companies that needed a long time to schedule. If they didn’t need to schedule, even the factory didn’t want them to see it. Finally, he said, “Well, since it’s OK to talk about so many details here, I’d better do it here. However, the deadline can only be two months. If it’s too much, I have to pay liquidated damages.”